Ranger Projects removed the existing ring beam, conducted further excavation on the site, and installed a new structural beam to accommodate a new roof over the O’Connor reservoir.
Value: $1.6m
Client: Duratech for Icon Water
Works: establish work roads to ridge, creation of structural ring beam and environmental stabilisation works
Challenges: difficult access to site, working at heights in preparation for formworks, line pump pours at over 170m long, specifically calibrated beams for structural steel roofing.